Project Need and Condition Prior to Performing the Work
This project was initiated to address the expansion needs of a customer who was installing a new three-well pad and adding a well to an existing pad. The site required significant upgrades, including the addition of three-phase separators, water transfer pumps, oil storage tanks, and water storage tanks. To enhance operational efficiency and safety, the customer needed to install level transmitters, pressure indicating transmitters (PITs), and level switches (tuning forks) on the new tanks and separators. Additionally, the project required the installation of new cable trays, conduit, supports, and wiring to connect the new devices and equipment. A crucial aspect of the project was installing and terminating fiber optic cable between the well pad and the Central Tank Battery (CTB), along with necessary PLC programming additions and new logic installations. Koniag Energy & Water’s subsidiary, Big G Electric, was tasked with these extensive requirements, needing a contractor capable of identifying necessary additions, sourcing materials and instrumentation, and completing the project with minimal oversight.
Implementation and Scope of Work Performed
Big G Electric embarked on this complex project with detailed planning and execution. The team sourced key items, including instruments, fiber optic cable, PLC equipment, and electrical equipment, ensuring all materials were available to meet the project’s tight timeline. They meticulously planned the routes for conduit and cable trays and executed these installations efficiently. Determining the necessary cables and wires for the new instrumentation and electrical equipment was a critical step, ensuring compatibility and optimal performance.
Working under challenging conditions, including high H2S areas, the certified team safely and efficiently installed new instrumentation in both existing and new tanks. Collaboration with client personnel was essential in determining the needed PLC equipment, which was subsequently purchased and installed to support the new instrumentation. The project also involved the installation of over one mile of fiber optic cable, including fiber fusion and OTDR testing to ensure proper operation. Throughout the project, Big G Electric encountered and overcame numerous obstacles, consistently finding solutions and staying on course.
Customer Involvement and Milestones
Customer involvement was crucial during the project’s key milestones. Regular communication and collaboration allowed Big G Electric to address any concerns and integrate client feedback effectively. The customer’s input was particularly valuable in the design and installation phases, ensuring the project met their specific needs. This collaborative approach led to several major achievements, including the successful installation of complex systems under budget and on time.
Results and Benefits
Upon completion, the project delivered significant benefits and impacts for the customer. The success of the project highlighted the reliability and expertise of Big G Electric’s team, who managed to complete the project from initial design to final implementation efficiently. The knowledgeable staff swiftly addressed any issues, ensuring the project was up and running without delays. The use of trenchers and other equipment owned by Big G Electric streamlined the process, reducing both time and costs typically associated with such extensive installations.
Highlights of the Completed Project
The completed project showcased the effectiveness of having a skilled and adaptable team like Big G Electric. Their ability to build and install complex electrical and automation systems with minimal oversight and under tight time frames underscored their proficiency. Strong relationships with suppliers enabled quick procurement of necessary instruments and materials, minimizing lead times and ensuring project deadlines were met. The customer’s satisfaction with the project highlighted the team’s commitment to quality and efficiency, solidifying their reputation as a reliable contractor for future projects. This project not only met but exceeded the customer’s expectations, enhancing the operational capabilities and safety of the well pad, and demonstrating the exceptional service provided by Koniag Energy & Water’s subsidiary, Big G Electric.